Stephen Patterson is a licensed engineer and Registered Roof Consultant with more than 47 years of roofing industry experience, including more than 37 years as a consulting engineer designing and evaluating roofs. He coauthored the full-length book, Roofing Design and Practice, published by Pearson Inc.; several editions of the monograph Wind Pressures on Low-Slope Roofs; as well as many technical papers and articles on roofing. He has evaluated well over 50 roof collapses.

The amount of ponding on the roof with ¼-in.-per-ft. slope is approximately 7.5 psf when the hydraulic head at the scupper reaches 3.0 in., explaining its relatively high degree of safety against ponding overload (Figure 5).

Because the discharge rate through drainage elements (drains or scuppers) is a function of the head of water over them (referred to as the hydraulic head), they discharge rainwater slowly in the beginning. Hydraulic head is the height of water above the inlet level of a drainage element. Figure 1 explains what hydraulic head is with respect to a primary roof drain.

It is the authors’ interpretation that the “free-draining edge” in this provision refers to the edge of the roof where drainage elements (scuppers or roof drains) are located and requires that their discharge rate be equal to or greater than the rainfall rate so that they provide “obstruction-free” drainage.

We will also assume that the roof has been designed for a live load of 20 psf with maximum permissible deflection of span/240—a typical specification for the stiffness of roof decks. Thus, for a 40-ft. span, the maximum permissible deflection under the design rain load is (40×12)/240 = 2.0 in. In other words, the roof deck will deflect 2 in. at its center when the equivalent uniform rain load on it reaches 20 psf.

ZurnTrench Drain

As the hydraulic head increases, the discharge rate through the drainage element increases. So, at the beginning of a rainfall, a thin layer of water travels to the drainage elements. The layer of water must become thicker for a drainage element to increase its discharge rate. This implies that, under a design rainfall rate, water must build up sufficiently on the roof for a drainage element to function up to its full (design) discharge capacity. Stated differently, a low-slope, parapeted roof will always be subjected to ponding loads and must, therefore, be designed for the maximum estimated ponding loads.

When there is a problem with your pressure relief valve, you can’t ignore it. Most of the time, broken pressure relief valves suffer from two things: Either the valve won’t open properly, or it might be leaking. In either case, you might need to have a professional take a look at it.

U.S. plumbing codes require that both primary and secondary (overflow) drainage for low-slope roofs be designed for 100-year, 60-minute-duration rainfall rate. ASCE 7 agrees with U.S. plumbing codes for this rainfall rate for the design of primary drainage but not for the overflow drainage. For overflow drainage, it recommends a 100-year, 15-minute rainfall rate.7 The National Oceanic and Atmospheric Administration (NOAA) National Weather Service Precipitation Frequency Data Server gives rainfall rates for various rainfall return periods (in years) and rainfall duration (in minutes).

Figure 8 and Figure 9 illustrate the roof framing configuration of this provision, which shows that the ponding on secondary framing members (steel joists, shown in green color) that are in the vicinity of the roof’s edge (housing the drainage elements) are subjected to (relatively large) ponding loads over their entire spans, requiring investigation of ponding instability in them if the roof slope is less than 1 in. per ft.

We will assume a parapeted roof whose deck slopes in one direction (supported on two opposite ends) and has a span of 40 ft. in the direction of the slope. We will further assume that: 1) the secondary drainage system consists of scuppers provided at the low end of the roof with their inlet levels raised by 2 in. above the roof and 2) the minimum required hydraulic head at the scuppers is 3 in. in order for them to discharge rainwater equal to the maximum rainfall rate on the roof. In other words, the minimum hydraulic head at the scupper must be 3 in. for its drainage rate to match the design (maximum) rainfall rate on the roof.

However, in most cases, you’ve just got to lift the valve. Keep lifting it until the brass stem moves. At that point, you should notice hot water rushing through. Lower the valve back down to stop the flow.

Simply open the valve to see whether pressure gets released. If it does, then everything should be functional. Before you open the valve, check to make sure that everything is connected. The valve should connect to a pipe. Also, that pipe should also run into some sort of basin to collect water as it releases.

So, you found some water puddled on the floor, and you determined it was from the pressure relief valve. Most of the time, that’s because the valve isn’t connected properly. Look closely at where the valve meets the tank. If you see water coming from there, then you should tighten the valve.

Apart from surface irregularities, an additional contributor to ponding is the deflection of roof decks due to the weight of the roof structure and rooftop equipment. The most significant cause of ponding, however, is the deflection of the deck from the buildup of water during rainfall. Stiffness of the deck plays an important role in reducing such ponding. In fact, the provisions of the ASCE 7 standard, as will be described further, clearly highlight the role of roof deck stiffness and roof slope on roof ponding loads.

As the illustrations of Figures 3 through 5 demonstrate, increasing roof slope decreases the ponding load on the roof, which may lead to ponding instability, and a ¼-in.-per-ft. (¼:12) slope is the minimum required. However, a steeper slope is not always better. A steeper slope no doubt improves roof drainage, reduces ponding load, and also increases the roof membrane’s durability. However, it creates some problems. For instance, the fire resistance of a roof decreases with increasing slope. More importantly, increasing the slope increases the depth of plenum space (between the roof and ceiling), thus increasing the building volume and façade area; hence, increasing the building’s cost. Therefore, most low-slope, membrane roofs are built with the minimum ¼:12 slope.

The International Institute of Building Enclosure Consultants (IIBEC) has been part of a coalition of industry associations that have encouraged governmental organizations to allow the roofing industry to get back to work on the nation’s roofs in the wake of the COVID-19 pandemic. IIBEC joined the Asphalt Roofing Manufacturers Association (ARMA), the Chemical Fabrics & […]

There are several reasons you might want to open the valve manually. Opening it could help you test whether it works. Also, you can open it to see if there are any leaks. Finally, you might need to relieve excess pressure from the hot water heater.

Forty years ago, an unprecedented avalanche occurred at Alpine Meadows Ski Resort in Lake Tahoe, California, and caused the deaths of seven people. I recently watched the 2021 documentary film Buried,1 which is a recounting by employees of Alpine Meadows of that incredible avalanche in 1982. They tried to prevent it, witnessed it, and then […]

As one of the most authoritative documents on structural safety in buildings, the ASCE 7 standard has led the way in the consideration of ponding instability on roofs, and the building codes have either adopted the standard’s provisions by reference or through their verbatim inclusion. The first mention of ponding instability in ASCE 7 appeared in its 1993 edition (ASCE 7-93), described in just ten words: “Roofs shall be designed to preclude instability from ponding loads.” This narrative simply cautioned the design professionals on ponding instability without providing any design guidance.

Figure 6 – Framing plan and section of a roof where the secondary framing members are perpendicular to the roof’s edge that houses the drainage elements.

The provision also implies that ponding instability be investigated where water ponding exists on a part of the roof or over the entire roof. As some water ponding will always exist on a low-slope roof under design rainfall rate, this provision is an across-the-board requirement; i.e., ponding instability is to be investigated over the “entire part” of all low-slope roofs. A typical example of this reminder is a roof with a small projected area, which can be more severely ponded as compared with its adjacent area(s). Additionally, this may also result in the overflow drainage system in the adjacent area(s) being deprived of attaining the design hydraulic head to provide the required drainage because most of the water will flow to the projected area, requiring ponding instability investigation (Figure 10).

Leaks are the most common issue that you’ll find with your pressure relief valve. Usually, you’ll notice the sound of water leaking first. This could be from a few things, but the pressure relief valve is a common culprit.

When you hear water leaking, you should test it. Use the steps from above to see if it works as usual. If it does, there could be an issue with the hot water heater’s pressure regulator or thermostat. Either way, contact Reactive Plumbing to figure out what’s wrong.

For the roof with 1⁄8-in.-per-ft. slope, the hydraulic head at the scupper reaches the minimum required value of 3.0 in. when the equivalent uniform load on the roof becomes approximately 16.5 psf with a centerline deflection of 1.3 in. (Figure 4). Because this is less than the maximum allowed live load of 20 psf, ponding overload will not occur at the design rainfall rate. However, as 16.5 psf is fairly close to 20 psf, ponding overload may occur during a short burst of rainfall that exceeds the design rainfall rate, causing ponding instability in that situation. (Short bursts of rainfall with rainfall rate substantially greater than the code-recommended design rainfall rate are common. As discussed in Section 5, ASCE 7 recommends taking this into account for the design of the overflow system.)

If everything is in working order, water should flow through the pipe. When it doesn’t, that could be a sign of mineral buildup. From time to time, these pipes become clogged with mineral deposits. When you notice something like that, let Reactive Plumbing know. Blocked pipes aren’t something that you can fix by yourself.

Why We Need Cool Roofs and What to Consider When Planning to Install Them By Kurt Shickman Rising temperatures are fast becoming the key challenge for our cities and urbanized areas. The effects of heat have negative outcomes for people’s health and well-being, social equity, energy use and peak demand, resilience of health, transportation and […]

The discharge tube collects water when the valve opens. Occasionally, these may break, and you’ll need to replace them. Screw them clockwise onto the hot water heater’s inlet valve. Most of the time, you won’t even have to turn it off.

This article is also available in audio format as a podcast. Search your favorite podcast app for “IIBEC,” visit https://anchor.fm/iibec, or listen right here in your browser.

Note that for the sake of clarity, the vertical scales in Figures 3 through 5 have been exaggerated with respect to the horizontal scale. However, because the deck deflection and the slope of the deck are on the same scale, the portrayal of water ponding is correct.

The first part of this provision reiterates the commonly understood drainage design principle for low-slope roofs in that the roof ponding load is to be determined assuming that the primary drainage system is fully blocked and the secondary system is functioning. Note that the illustrations of ponding in Figures 3 through 5 are based on this requirement.

Figure 8 – Framing plan and section of a roof where the secondary framing members are parallel to a roof’s edge that houses the drainage elements.

Figure 9 – Detail section Q (refers to Figure 8). Note that the secondary members (joists) near the roof’s drainage edge are subjected to relatively large ponding loads over their entire spans.

Join presenter Samir Ibrahim, F-IIBEC, AIA, CSI, and moderator Brandon Gemma on Wednesday, October 16 at 2:00 p.m. ET for a live webinar, Leak Investigation: Methods, Assessment, and Strategies. This activity has been approved for 1.0 IIBEC CEH. This activity has been approved for 1.0 AIA LU/HSW.

The narrative of ASCE 7-95 has been identified as Situation 1 in ASCE 7-16. Expanding the need for ponding instability investigation from one to four situations, which have obviously been overlooked for too long, ASCE 7-16 standard has made a significant contribution to life safety in roof design. Stated differently, according to previous editions of ASCE 7, investigation of ponding instability of low-slope roofs was required only for roofs with a slope of less than ¼ in. per ft. The current edition requires this investigation for roofs with a slope of less than 1 in. per ft. where the roof deck’s structural framing demands it. This demand is articulated under Situation 2 (where secondary framing members are parallel to the roof’s free-draining edge) and, more pointedly, in Situation 3 (where the span-to-spacing ratio of secondary framing members exceeds 16 and they are parallel to the roof’s free-draining edge).

Some valves become stuck in their closed position. Unless you fix it, then the pressure might build up excessively. If your valve seems stuck, try moving it by hand. A lot of the time, simply opening it a few times will fix any issues.

Although the standard by itself is not legally enforceable, most of its provisions are adopted by building codes of various U.S. jurisdictions, indirectly bestowing legal authority upon it. For example, Chapter 16 of the International Building Code (IBC), titled “Structural Design,” which covers “minimum design requirements so that the structural components of buildings are proportioned to resist the loads that are likely to be encountered,” is based almost entirely on the ASCE 7 standard.

Every hot water heater has to have a pressure relief valve. These valves prevent the hot water heater from exploding under excessive pressure.

A fundamental strategy to reduce roof ponding is to provide an adequately sloped roof. Increasing the slope helps in several ways. First, it ensures that water will reach the drainage elements (roof drains or scuppers) more rapidly. Theoretically, if the roof is perfectly flat (an ideal dead-level roof), it will drain water toward the drainage elements, but do so slowly.

An additional factor that affects ponding instability is the stiffness of a roof’s structural framing members—primary framing members, secondary framing members, and the deck. The stiffer the members, the less likely the ponding instability. The current (2018) IBC states that ponding instability of roofs from rainwater (and snow, where present) should be evaluated according to the provisions given in the ASCE 7 standard.3 The current version, ASCE 7-16, requires that the roof’s structural framing be analyzed to ensure that the structure has adequate stiffness and strength to “preclude progressive deflection (i.e., instability).” (The American Institute of Steel Construction, (AISC), and the Steel Joist Institute (SJI) provide resources for the investigation of ponding instability on roofs.4,5

Pre slopedtrench drain

The International Institute of Building Enclosure Consultants (IIBEC) has been part of a coalition of industry associations that have encouraged governmental organizations to allow the roofing industry to get back to work on the nation’s roofs in the wake of the COVID-19 pandemic. IIBEC joined the Asphalt Roofing Manufacturers Association (ARMA), the Chemical Fabrics & […]

Figure 5 – Ponding on the hypothetical roof at ¼-in.-per-ft. slope. The first sketch represents the original, unponded roof, and the second sketch illustrates the extent of ponding and the resultant deflection of the same roof.

Fire safety falls within the realm of fire engineering, and the two important U.S. organizations focusing on its study are the Society of Fire Protection Engineers (SFPE) and the National Fire Protection Association (NFPA). Roof collapses from water ponding and blow-offs are related to the roof’s structural design. The organizations focused on structural safety in buildings are the American Society of Civil Engineers (ASCE) and the Structural Engineering Institute (SEI).

The weight of ponded water causes the roof deck to deflect. As the deck deflects, it is able to hold more water, causing additional deflection, which increases the depth of standing water further, which in turn causes additional deflection, and so on. If the deck (and its supporting frame) have not been designed with sufficient stiffness, the increase in ponding due to progressive deflection may exceed the structural strength of the deck, leading to its collapse.

Madan Mehta is a professor of architecture at the University of Texas at Arlington and a licensed engineer. Mehta has authored several books, monographs, and research papers, which include coauthoring roof-related books, monographs, and papers with Patterson. His 1,000-page book Building Construction: Principles, Materials, & Systems, published by Pearson Inc., is in its third edition and is one of the two most widely used books by practicing architects and students of architecture and construction engineering in North America.

Typically, the T&P valve is found near the top of your unit. If you think there is a problem with it, you’ll need to locate it to check. Look for a valve that is connected to the tank by a discharge tube. These discharge tubes usually face upwards. The whole apparatus is screwed into an inlet valve on the tank.

The second part of this provision states that ponding instability can also occur from excessive snow load in addition to that from the rain load.

Additionally, construction tolerances and workmanship lapses can be such that high and low spots are always present on a roof deck. These surface irregularities on an otherwise dead-level roof will produce some pools of ponded water. Therefore, the second advantage of increasing roof slope is that it overcomes the obstructions caused by incidental surface irregularities and reduces the adverse effect of shallow ponds on drainage and a roof membrane’s durability.

Figure 4 – Ponding on the hypothetical roof at 1⁄8-in.-per-ft. slope. The first sketch represents the original, unponded roof, and the second sketch illustrates the extent of ponding and the resultant deflection of the same roof.

Usually, hot water heaters shouldn’t exceed 150psi. When pressures rise above that, the pressure relief valve opens briefly. Then, a small burst of water releases. T&P valves also open whenever temperatures near the boiling point.

Image

Why We Need Cool Roofs and What to Consider When Planning to Install Them By Kurt Shickman Rising temperatures are fast becoming the key challenge for our cities and urbanized areas. The effects of heat have negative outcomes for people’s health and well-being, social equity, energy use and peak demand, resilience of health, transportation and […]

Note that the discussion of roof slope, illustrated in Figures 3 through 5, tacitly assumed the roof configuration mentioned in this provision. The discussion concluded that if the roof slope is equal to (or greater than) ¼ in. per ft., the ponding load on the roof will be too small to cause ponding overload (hence, ponding instability).

Note that ASCE 7 provisions (Situations 1 to 3) for minimum slope of ¼ in. per ft. and 1 in. per ft. are based on maximum deflection-to-span ratios of 1/2406—the same as that assumed in the ponding illustrations of Figures 3 through 5.

Watts Drainage List Price 2024

Finally, turn the hot water heater back on to see if that fixed the problem. If it didn’t, you’ll need to speak to a professional. More than likely, it’s time to get a replacement.

ASCE 7-16 identifies the following bays of a roof’s structural framing that may be subjected to instability, referred to as susceptible bays. The standard requires particular attention to the following situations.

Don’t touch the pressure relief valve when the hot water heater is still on. You could cause yourself serious burns. If you suspect that something is wrong with the pressure, hire a professional plumber.

Commercialtrench drain

Note that although the IBC’s requirement of minimum 1⁄8-in.-per-ft. slope for a coal tar built-up roof is primarily based on its propensity for slippage at higher slopes, coal tar pitch is more resistant to ponding water than asphalt.

The standard is updated periodically to keep abreast of the developments in this complex but important field because an accurate determination of loads on a building is fundamental to its structural safety. Various editions of the standard are distinguished from each other by a two-digit number at the end of their designation, which refers to the year of publication (or the target year of publication). For example, the ASCE 7-02 standard was published in 2002. On the other hand, its current edition, ASCE 7-16, was planned for 2016 publication, but was released in 2017. Its next edition is planned for release in 2022.

Historically, virtually all low-slope roofs have been built to less than 1 in. per ft. The authors’ presumption is that the roofs for which the secondary framing members are parallel to the roof’s free-draining edge have also been built with a slope of less than 1 in. per ft., and no investigation of their ponding instability was undertaken because the codes did not require it.

Hot water heaters are built as a closed system. As such, excess energy can’t escape without opening the system. Since water expands as it gets warmer, pressure can build up quickly. Without a pressure relief valve, the hot water heater could burst.

Forty years ago, an unprecedented avalanche occurred at Alpine Meadows Ski Resort in Lake Tahoe, California, and caused the deaths of seven people. I recently watched the 2021 documentary film Buried,1 which is a recounting by employees of Alpine Meadows of that incredible avalanche in 1982. They tried to prevent it, witnessed it, and then […]

If that doesn’t work, you’ll need to have a plumber repair it. When the valve is stuck in the open position, nothing can relieve any pressure. When it is stuck in a closed position, your hot water heater won’t work at all.

NDStrench Drain

When your hot water heater was installed, someone set up the pressure relief valve. They set a specific temperature and pressure point to activate it. When those metrics are met, the valve opens. It stays open until the temperature and pressure drop back to safe levels.

Three important safety issues related to low-slope roofing are: 1) fires on roofs from internal or external sources, 2) roof collapses resulting from the ponding of water (and snow, where present) from extreme storms, and 3) roof blow-offs from extreme windstorms.

Water accumulates on parapeted (raised-edge) roofs, which are typically low-slope roofs. As explained later in this section, water accumulation (commonly referred to as ponding) on a parapeted, low-slope roof is an inescapable design issue. It can be mitigated through good design but cannot be eliminated entirely and must be accounted for in the design of the roof system. Three factors affect ponding on such roofs: 1) roof slope, 2) the roof deck’s structural stiffness, and 3) the roof’s drainage design.

An important document dealing with structural safety in buildings, published jointly by ASCE and SEI, is the ASCE/SEI standard, titled Minimum Design Loads and Associated Criteria for Buildings and Other Structures, commonly known as the ASCE 7 Standard. This standard deals comprehensively with all types of loads on buildings and non-building structures, such as rooftop equipment, decks, billboards, signages, etc. It specifies minimum loads for which buildings and other structures must be designed, such as dead loads, live loads, snow loads, rain loads, earthquake loads, wind loads, and so on.

WattsDead LevelD Price

Figure 7 – Detail section P refers to Figure 6. The joists near the roof’s drainage edge are subjected to gradually decreasing ponding loads, limited to a small part of their spans.

The phenomenon of progressive deflection is referred to as ponding instability. Ponding instability is caused by ponding load that is greater than that for which the roof structure has been designed based on the roof’s strength and stiffness. Because ponding instability can lead to a roof’s collapse, the first line of action (not the only one) for its prevention is to provide adequate slope in the roof that renders adequate hydraulic head at drainage elements—to increase their drainage rate—and hence, preclude ponding overload on the roof.

We will first consider the drainage of this hypothetical roof with 1⁄16-in.-per-ft. slope. On determining the amount of ponding on it, we see that the equivalent uniform ponding load on the roof reaches the maximum allowed rain load of 20 psf (with centerline deck deflection of 2 in.) when the hydraulic head at the scupper is approximately 2.2 in. (Figure 3). As this is below the minimum hydraulic head of 3.0 in. required for the drainage rate through the scuppers to be in equilibrium with the rainfall rate, the ponding on the roof will increase progressively until the hydraulic head at the scupper equals 3.0 in. In that situation, the ponding load on the roof would be greater than its designed capacity of 20 psf, which could cause the roof’s collapse.

The IBC requires that the minimum roof slope be ¼ in. per ft. for membrane roofs (built-up roofs, modified-bitumen roofs, and single-ply roofs), except coal tar built-up roofs, for which the minimum required slope is 1/8 in. per ft.2 Although the code specification of minimum roof slope is not based on ponding overload alone, it is important to understand that roof slope plays an important role in reducing ponding overload. To fully appreciate this fact, we will examine the extent of ponding and the corresponding ponding load on a roof for the following three values of roof slope:

Presumably, the building to be reroofed was built in accordance with the applicable building code at the time; so, roofs with slope less than ¼ in. per ft. were analyzed for ponding instability. However, it is most likely that the roofs with secondary framing members parallel to the free-drainage edge and slope less than 1 in. per ft. were not analyzed for ponding instability because the applicable codes did not require it. In that scenario, what should the roof designer do?

Before tightening the valve, disconnect the water heater first. Otherwise, you could get burnt. Wait until the water cools sufficiently. Then, unscrew the valve entirely. Slowly screw it back into place once you’ve taken it off. Make sure that it fits tightly onto the inlet valve.

This educational program focuses on the evolution of methods and practices used to detect moisture intrusion, primarily in roofing and waterproofing. Different methods of testing will be discussed, and appropriate selection criteria, depending on each project’s conditions, will be explored. The need for stricter quality control will be discussed and suitable testing methods identified. Participants will be able to generate a forward-thinking strategy when performing field assessments of designing a new project. This webinar will focus on a review of the methods available and is not specific to any one leak detection system.

It has been our experience that buildings with secondary framing members parallel to the free-drainage edge are far more likely to collapse than structures with secondary members perpendicular to the free-drainage edge. The failure to analyze such roofs for ponding instability at reroofing could result in a serious life-safety issue.

Image

The narrative was refined in the standard’s next edition (ASCE 7-95) as: “Roofs with a slope of less than ¼ in. per ft. shall be investigated by structural analysis to assure that they possess adequate stiffness to preclude progressive deflection (i.e., instability) as rainfall on them or meltwater is created from snow on them.” There was neither any change in the above narrative, nor any additional provision introduced for several editions of the standard until its most recent edition—ASCE 7-16. As described in Section 4 (under title: “Susceptible Bays”) of this paper, ASCE 7-16 has identified four situations for which ponding instability of roofs must be investigated.

The calculation of ponding loads on roofs of different slopes, shown in Figures 3 through 5, concluded that for roof slope equal to (or greater than) ¼ in. per ft., the ponding overload (and hence, ponding instability) does not occur. This, however, is true only for a certain configuration of a roof’s structural framing. In other words, ponding instability is not simply related to roof slope but also to the relationship of roof slope with a roof’s structural framing configuration.

Dead levelmeaning

The changes made in ASCE 7 affect almost all aspects of a building’s structural safety. However, the discussion presented here deals with the effect on a building’s structural safety related to the design of its roofing system. More specifically, this paper covers the contribution of the current ASCE 7 standard (ASCE 7-16) to the design of low-slope roof systems to prevent roof collapses from rainwater ponding from extreme rainstorms.

In an earlier paper, the authors endorsed the ASCE 7 standard recommendation, giving the rationale for the endorsement.8

ASCE 7-16’s expanded definition of framing bays, susceptible to ponding instability, presents a serious dilemma for the contemporary roof designer for reroofing. Does the roof designer need to examine the structural framing configuration of the existing roof to ensure that it conforms with the current ASCE 7 standard? This question is particularly important where the existing roof framing requires a minimum 1-in.-per-ft. slope to meet with the current ASCE 7 standard but has been provided with a lower slope.

WattsDead LevelP

This provision is related to Provision 2 and refers to long-span secondary members. Because of their long span, the secondary members are subjected to large deflection. For example, if secondary members are spaced 6 ft. on center (typical spacing for steel roof joists), and if their span is greater than 6 × 16 ft. or 96 ft.—a fairly long span—this provision requires attention to this situation to ensure that the secondary members (joists) have sufficient stiffness to preclude progressive deflection under ponding load.

Image

Sometimes, you might need to open the pressure relief valve manually. Before doing anything, take a look at the owner’s manual. It should specify any specific steps that should be followed.

Reactive plumbing recommends testing T&P valves at least once every 12 months. That way, if there are any problems, you’ll find out about them before anything happens.

Figure 6 and Figure 7 illustrate the roof framing plan and section of a roof referred to in this provision—where the secondary framing members (roof joists, shown in green color) are perpendicular to the roof’s edge, which houses the drainage elements. Note that in this situation, the joists are subjected to gradually decreasing ponding loads, which are limited to a small part of their spans. Note also that the lesser the slope, the greater the spread of ponding. This provision, therefore, requires that a roof whose framing plan is as shown in Figure 6, and which has a slope less than ¼ in. per ft., be investigated for ponding instability.

Generally, a 100-year, 15-minute rainfall rate is approximately double the 100-year, 60-minute rainfall rate for most U.S. locations. In other words, determining ponding instability on low-slope roofs using 100-year, 60-minute rainfall rates grossly underestimates the real ponding instability that exists on roofs. The disagreement between the plumbing codes and the ASCE 7 standard for design rainfall rates for secondary drainage design is again a dilemma for the roof designer.

Reactive Plumbing is your premier North Shore plumbing company. They serve anyone living in North Shore, Sydney, or The Hill’s District. If you’ve had any problems with your T&P valve, they can help. They also offer financing options, so anyone can afford their services. Whether you need help with your pipes or the toilet, they’ve got the expertise for the job. They’ll install, repair and service all of your home’s plumbing. Contact Reactive Plumbing next time you have any plumbing issues.

A term closely related to hydraulic head is static head. Static head refers to the elevation of the inlet level of the drainage element above the roof surface. Static head exists only with secondary (overflow) drainage elements, together with hydraulic head (Figure 2). Static head is constant and is not influenced by the depth of ponded water. With primary drainage elements, only the hydraulic head exists (i.e., the static head is absent), as shown in Figure 1.

Figure 3 – Ponding on the hypothetical roof at 1⁄16 in.-per-ft. slope. The first sketch represents the original, unponded roof, and the second sketch illustrates the extent of ponding and the resultant deflection of the same roof.

Like the U.S. plumbing codes, the ASCE 7 standard1 requires that a roof be designed “to sustain the load of all rainwater that will accumulate on it if the primary drainage system is blocked plus the uniform load caused by water that rises above the inlet of the secondary drainage system at its design flow.” The standard provides the following equation for estimating the load of rainwater (rain load): R = 5.2(ds + dh) where R = rain load in pounds per square foot (psf) ds = static head of water in inches dh = hydraulic head of water in inches The constant “5.2” represents the weight of a 1-in.-thick layer of water in psf, obtained from the density of water being 62.4 pounds per cubic foot (pcf).

The amount of pressure released depends on how the relief valve was set up. Most of the time, it releases 20% or less of the overall pressure. This is called the blowdown phase. Once it reaches safe levels again, it will close automatically.

Reactive Plumbing has assisted homeowners with hot water heaters for years. All hot water heaters have a valve to release pressure. These are commonly called T&P valves, and they are essential for safety. Do you know where to find your hot water heater’s T&P valve?