PRESSURE REGULATING VALVE BERMAD PRV ... - plumbing prv valve
The following streets will be closed for the 6th Avenue Autumnfest Saturday, October 26th, 2024 at the discretion of the NYPD in Manhattan.
Right-lane will become an exit only lane at Exit 3 24/7. Additional lane will be closed Monday to Friday from 11 pm to 5 am, Saturday and Sunday from 1 am to 8 am, and Sunday night from 10 pm to 5 am next morning through March 3, 2025, to facilitate East 138 Street Bridge replacement. Southbound exit ramp to 138 Street bridge will be closed Monday to Friday from 11 pm to 5 am, Friday from 11 pm to 6 am next morning, Saturday from 11 pm to 9 am next morning, and Sunday from 11 pm to 5 am next morning to facilitate water main connections.
This street will be closed from 9 pm to 5 am weeknights through 11/7/24 to erect the gantries for the Park Avenue viaduct.
This street will be closed from 8 am to 6 pm Saturday and Sunday through 10/26/24 for use of boom truck for minor repairs.
Center median will be closed and only one lane in each direction, one sidewalk, and one crosswalk will be maintained at all times Monday to Friday from 9 am to 2 pm and from 10 pm to 5 am next morning. These closures are necessary to facilitate rehabilitation of eastern sidewalk and will continue through November 8, 2024.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/10/24 for rock breaking and installation of new sewer and water services.
Center of the roadway will be closed. Approximately 36 parking spaces will be eliminated, and the parking lanes will be used as traffic lanes in each direction. Closures are Monday to Friday from 7 am to 6 pm through October 25, 2024, to facilitate bridge rehabilitation.
Sidewalks will be closed. Approximately 30 parking spaces will be eliminated. Pedestrian walkways will be provided on the parking lane. These closures are necessary to facilitate bridge rehabilitation and will continue through October 25, 2024.
This street will be closed from 9 am to 4 pm Friday through 11/2/24 for use of concrete pumps, boom trucks and knuckle booms.
Shoulder and adjacent lane in both directions will be closed Monday to Friday from 10 am to 3 pm, through November 1, 2024, to facilitate electrical repairs.
Single-lane in both directions will be closed Monday to Friday from 10 pm to 5 am next morning and double-lane will be closed from 1 am to 5 am, through November 8, 2024, to facilitate underdeck rehabilitation. At least one lane in each direction will be maintained.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 10/27/24 to facilitate crane operation.
This street will be closed from 9 am to 4 pm Friday, 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 10/31/24 for pump concrete and hoist materials.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 to facilitate crane operation.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 to facilitate crane operation.
This ramp will be closed through December 24, 2024, to facilitate Hunts Point Interstate Access Improvement Project. Trucks and buses are advised to use the exit ramp towards Edgewater Road/Hunts Point Market and follow the detour signs and use the Leggett Avenue entrance ramp to westbound Bruckner Expressway. Cars are advised to use the temporary exit ramp towards Whitlock Avenue and follow the detour signs to westbound Bruckner Expressway.
Other state and local agencies are responsible for street construction work in New York City. Visit the Department of Design and Construction, the New York State Department of Transportation, the Port Authority of New York and New Jersey and MTA for more construction and traffic information. Check who operates bridges and tunnels
The following streets will be closed for the 7th Annual Bronx Da Walk Run Roll To End Domestic Violence on Saturday, October 26th, 2024 at the discretion of the NYPD in the Bronx.
Single-lane will be closed Friday from 11 pm to 7 am next morning, and Sunday from 11 pm to 10 am next morning. Double-lane will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 1 am to 7 am. These closures are necessary to facilitate East Side Coastal Resiliency Project and will continue through September 11, 2026.
This street will be closed from 9 pm to 5 am weeknights through 10/28/24 to erect the gantries for the Park Avenue viaduct.
Single-lane in each direction will be closed Monday to Friday from 10 pm to 5 am next morning. Single-lane northbound will be closed Saturday and Sunday from 7 am to 2 pm. These closures are to facilitate maintenance and will continue through November 10, 2024.
This street will be closed from 7 am to 6 pm Monday to Friday through 10/28/24 for concrete restoration on the track of the Rockaway viaduct line.
The following streets will be closed for the Day Of The Dead Parade on Sunday, October 27th, 2024 at the discretion of the NYPD in Brooklyn.
Single-lane will be closed Monday to Friday from 10 am to 2 pm, Monday to Thursday from 11 pm to 6 am next morning, Friday from 11 pm to 2 pm next day, and Sunday from 12:01 am to 2 pm. Double-lane will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 1 am to 6:30 am, and Sunday from 2 am to 9 pm. These closures are necessary to facilitate watermain repairs and will continue through October 31, 2024.
Single-lane at a time in either direction on the upper and lower roadways will be closed Monday to Friday from 10 pm to 5 am next morning to facilitate maintenance. At least one lane of traffic in each direction will be maintained at all times.
This street will be closed from 9 am to 3 pm Monday to Friday through 11/12/24 for concrete pump and booming operations.
Northbound will be reduced to one travel lane and parking lane will be closed. Northbound sidewalk and bike lane will be shifted. These closures are necessary to facilitate rehabilitation of the Henry Hudson Parkway Bridge and will continue through November 26, 2024.
This street will be closed from 9 am to 4 pm Friday through 12/1/24 for mobile crane operations for installation/removal of equipment and material and steel erecting.
This street will be closed from 9 am to 4 pm Friday through 11/12/24 for concrete pouring and knuckle boom/boom truck operations for new building project.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 10/27/24 to facilitate crane operation.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/1/24 for conduit installation for new business.
This street will be closed from 9 pm to 5 am Monday to Friday through 11/17/24 for water main valve chamber installation-contract# HBX180.
Bridge will be closed from 8 pm Friday, October 25 to 5 am Monday, October 28, 2024 to facilitate replacing half of the bridge deck and structure. Metropolitan Avenue may be used as an alternate route.
This street will be closed from 9 pm to 5 am weeknights through 12/1/24 for gas main replacement, permit S01-152024268-A00.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 for use of knuckle boom to hoist dunnage.
Eastbound mainline will be closed for 15 minutes at a time, Monday to Friday from 12:01 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 1 am to 9 am through April 23, 2026, to facilitate sign structure removal and installation. Mainline shoulder lane will be closed 24/7 along the project limit to replace sections with traversable curbs and guiderail.
Single-lane will be closed in both directions Monday to Friday from 12:01 am to 5 am and double-lane will be closed from 1 am to 5 am, except holidays. These closures are to facilitate rehabilitation of the bridges overpassing Webster Avenue, Metro-North Railroad, and Third Avenue and will continue through December 14, 2026.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 for building inspection from boom truck.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/14/24 for conduit installation for new service/service upgrade and manhole enlargement.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/16/24 for reconstruction of Nassau Street.
This street will be closed from 9 pm to 5 am weeknights through 10/31/24 to erect the gantries for the Park Avenue viaduct.
Single-lane in both directions will be closed Monday to Friday from 10 pm to 6 am next morning, and Saturday from 10 pm to 7 am. Bridge will be fully closed Monday to Friday from 12:01 am to 5 am. Bronx-bound will be closed Saturday from 12:01 am to 6 am and Manhattan-bound will be closed Saturday from 12:01 am to 7 am. Alternating single-lane closures in either direction Monday to Saturday from 10 am to 2 pm. These closures will continue through November 30, 2024, which are to facilitate testing and rehabilitation. There will be no closures on November 28, 2024.
Single-lane in both directions will be closed Monday to Friday from 9 am to 4 pm through November 15, 2024, to facilitate rehabilitation. West sidewalk will remain closed.
This street will be closed from 9 am to 3 pm Monday to Friday through 10/31/24 for use of knuckle boom and concrete pump.
This traffic alert details the locations of road construction and other events that will affect the flow of traffic this weekend. This information is subject to change. Check the Weekly Traffic Advisory Check the Special Traffic Advisory Check Gridlock Alert Days
Single-lane at a time in either direction will be closed Monday to Friday from 10 am to 3 pm through November 15, 2024, to facilitate Hillside Avenue Bridge underdeck repairs.
Single-lane in either direction on the 18 Avenue will be closed Monday to Friday from 9 am to 4 pm. Approximately 40 parking spaces on 18 Avenue and 18 parking spaces on 53 Street near the intersection will be eliminated.
This street will be fully closed from 9 am to 4 pm Friday through 12/16/24 for booming/pumping operations for new building.
This street will be closed from 7 am to 6 pm Monay to Friday through 12/23/24 for new Stapleton Waterfront infrastructure.
Single-lane eastbound will be closed Monday to Friday from 10 am to 2 pm, Monday to Thursday from 10 pm to 5 am next morning, Friday from 10 pm to 7 am next morning, Saturday from 10 am to 3 pm and from 10 pm to 3 pm next day. Double-lane eastbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 1 am to 9 am. Single-lane westbound will be closed Monday to Friday from 10 am to 3 pm, Monday to Thursday from 10 pm to 5 am next morning, Friday from 10 pm to 6 am next morning, Saturday from 10 am to 3 pm and from 10 pm to 3 pm next day. Double-lane eastbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 12:01 am to 6 am, and Sunday from 1 am to 9 am. These closures are necessary to facilitate Safety and Mobility Improvements and will continue through April 23, 2026.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 for installation of new water and sewer services.
Single-lane northbound and/or southbound will be closed Monday to Thursday from 10 pm to 5 am next morning, Saturday from 12:01 am to 9 am, and Sunday from 1 am to 11 am. Double-lane will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 1 am to 7 am, and Sunday from 1 am to 7 am. These closures are necessary to facilitate median reconstruction and will continue through August 15, 2026.
This street will be closed from 7 am to 6 pm Monday to Friday, 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 10/31/24 for HDD Con Ed Goethals to Fox Hills 138 KV SD feeder installation.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/27/24 to facilitate crane operation.
Single-lane north side lane and north sidewalk will be closed Monday to Friday from 7 am to 7 pm, Saturday from 8 am to 6 pm, and Sunday from 9 am to 6 pm. These closures are to facilitate bridge rehabilitation and will continue through November 15, 2024. One lane in each direction will be maintained.
This street will be closed from 9 am to 4 pm Friday through 10/27/24 for use of knuckle boom to hoist wood/steel building materials.
This street will be closed from 8 am to 7 pm Saturday and/or 9 am to 8 pm Sunday through 10/27/24 to facilitate crane operation.
This street will be closed from 7 am to 3 pm Saturday through 10/27/24 to excavate and install conduit for new major service.
This street will be closed from 9 am to 4 pm Friday through 1/9/25 for use of boom, knuckle boom and concrete pump to work on new building.
Single-lane westbound will be closed Monday to Friday from 9 am to 7 pm, Saturday from 8 am to 6 pm, and Sunday from 9 am to 6 pm. Double-lane westbound will be closed Monday to Friday from 10 am to 2 pm. These closures are to facilitate rehabilitation and will continue through November 16, 2024.
This street will be closed from 9 am to 4 pm Monday to Friday, and 9 am to 4 pm Saturday through 11/16/24 to facilitate crane operation.
This street will be closed from 9 am to 4 pm Friday through 11/21/24 for concrete pump to complete work on 9th floor and roof.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/10/24 for conduit installation for new business.
Single-lane northbound will be closed Monday to Friday from 7 am to 9 am. Single-lane in both directions will be closed Monday to Friday from 9 am to 1 pm and 10 pm to 7 am next morning. These closures are necessary to facilitate maintenance and will continue through November 1, 2024. One lane of traffic in each direction will be maintained at all times.
This street will be closed from 9 am to 2 pm Monday to Friday through 11/30/24 for concrete pouring and booming operations new 7 story building.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 10/27/24 to facilitate crane operation.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 to facilitate crane operation.
Single-lane Manhattan-bound north outer roadway will be closed from 6 pm Friday October 25 to 5 am Monday, October 28, 2024, and Monday to Friday from 6 pm to 5 am next morning. Single-lane Manhattan-bound north inner roadway will be closed from 8 pm Friday October 25 to 5 am Monday, October 28, 2024, and Monday to Friday from 8 pm to 5 am next morning. Single-lane Brooklyn-bound south outer roadway will be closed Monday to Friday from 5 am to 6 pm. Single-lane Brooklyn-bound south inner roadway will be closed Monday to Friday from 10 am to 3 pm. These closures are necessary to facilitate Structural Strengthening and rehabilitation. Also, single-lane at a time Manhattan-bound will be closed Monday to Friday from 10 am to 3 pm and single-lane at a time Brooklyn-bound will be closed Monday to Thursday from 10 pm to 5 am next morning to facilitate maintenance.
This street will be closed from 8 am to 6 pm Saturday and Sunday through 10/26/24 for use of boom truck for minor repairs.
Shoulder and adjacent lane will be closed Monday to Friday from 10 am to 2 pm on the eastbound and from 10 am to 3 pm on the westbound, through November 1, 2024, to facilitate electrical repairs.
This street will be closed from 9 am to 2 pm Monday to Friday and may also work from 8 am to 4 pm Saturday through 11/15/24 for hoisting and pumping operations.
This street will be closed from 3 am to 4 am Sunday, and 9 pm Friday to 6 am Monday through 11/11/24 for associated closure.
Single-lane eastbound will be closed Monday to Thursday from 10 am to 3 pm and 9 pm to 5 am next morning, Friday from 10 pm to 7 am next morning, and Saturday from 10 pm to 7 am next morning. Double-lane eastbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 12:01 am to 7 am, and Sunday from 12:01 am to 7 am. Eastbound Exit Ramp 2S will be closed Monday to Thursday from 11 pm to 7 am next morning, Friday from 11 pm to 7 am next morning, and Saturday from 11 pm to 7 am next morning. These closures are necessary to facilitate JFK Redevelopment Program and will continue through December 31, 2025.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 for use of boom truck to hoist steel dunnage and cell site equipment.
This street will be closed from 10 am to 10 pm Saturday and Sunday through 11/24/24 for conduit installation for new service.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 10/27/24 to facilitate crane operation.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 to facilitate crane operation.
Single-lane will be closed in both directions Monday to Friday from 10 am to 2 pm and from 10 pm to 5 am next morning. Double-lane in both directions will be closed Monday to Friday from 1 am to 5 am. These closures are to facilitate underdeck repairs and will continue through November 8, 2024.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 for building inspection from boom truck.
Shoulder and adjacent lane will be closed Monday to Friday from 10 am to 2 pm on the eastbound and from 10 am to 3 pm on the westbound, through November 1, 2024, to facilitate electrical repairs.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 for knuckle boom rigging/hoisting operation.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 for building inspection from boom truck.
This street will be closed from 9 am to 5 pm Monday to Friday, and 8 am to 6 pm Saturday through 12/7/24 to facilitate crane operation.
Beginning on Friday, August 9 through approximately October 31, 2024, the bridge will be reduced to alternate one-way operation with flaggers and the adjacent sidewalk will be closed Monday to Friday from 9 am to 4 pm, Saturday and Sunday from 7 am to 5 pm, to facilitate lead paint removal and repainting project.
This street will be closed from 9 am to 4 pm Friday through 10/31/24 for concrete pump, material delivery, boom operations.
This street will be closed from 7 am to 6 pm Monday to Friday through 10/28/24 for concrete restoration on the track of the Rockaway viaduct line.
This street will be closed from 3 am to 4 am Sunday, and 9 pm Friday to 6 am Monday through 11/11/24 for associated closure.
This street will be closed Friday from 9 am to 4 pm through 11/6/24 to facilitate Boom, Knuckle Boom, and Concrete Pump.
This street will be closed from 9 am to 4 pm Friday through 10/25/24 for rebar boom deliveries and concrete pump, boom truck.
This street will be closed from 7 am to 7 pm Saturday and Sunday through 11/10/24 for DOT# 9065 at 890 Broadway-vault repairs.
This street will be closed from 7 am to 4 pm Friday through 10/31/24 for special operations to include knuckle boom equipment.
Shoulder and adjacent lane in both directions will be closed Monday to Friday from 10 am to 3 pm, through November 1, 2024, to facilitate electrical repairs.
This street will be closed from 9 am to 4 pm Friday and 8 am to 4 pm Saturday through 10/28/24 for booming and pumping operations.
Alternating Lane will be closed in both directions Monday to Friday from 7 am to 6 pm through November 1, 2024, to facilitate bridge rehabilitation. Approximately 60 parking spots will be eliminated, and the travel lane will be shifted to the parking lane.
Right-lane will become an exit only lane at Exit 3 24/7. Additional lane will be closed Monday to Friday from 11 pm to 5 am, Saturday and Sunday from 1 am to 8 am, and Sunday night from 10 pm to 5 am next morning through March 3, 2025, to facilitate East 138 Street Bridge replacement. Full closure may occur Monday to Friday between 12 am and 5 am for demolition and erection of the superstructure.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/10/24 to facilitate crane operation.
This street will be closed from 9 am to 4 pm Friday through 12/1/24 for mobile crane operations for installation/removal of equipment and material and steel erecting.
This street will be closed fully closed from 9 pm to 5 am weeknights through 11/11/24 to erect the gantries for the Park Avenue viaduct.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 for knuckle boom rigging/hoisting operations.
This street will be closed from 9 am to 4 pm Monday to Friday when school is in session and 8 am to 4 pm Saturday through 10/28/24 for booming and pumping operations.
This street will be closed from 6 am to 4 pm Friday, and 5 am to 9 pm Sunday through 10/27/24 for mainline track repairs.
The following streets will be closed for the Sunnyside Post Mile on Saturday, October 26th, 2024 at the discretion of the NYPD in Queens.
Single-lane westbound will be closed Monday to Thursday from 10 am to 2 pm and 10 pm to 5 am next morning, Friday from 10 pm to 6 am next morning, and Saturday from 10 pm to 11 am next morning. Double-lane westbound will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 2 am to 9 am. These closures are necessary to facilitate JFK Redevelopment Program and will continue through December 31, 2025.
This street will be closed from 9 am to 4 pm Friday through 10/29/24 for associated closure during booming and concrete pumping at 150 Lawrence Street.
This street will be closed from 9 am to 5 pm Monday to Friday, and 7 am to 5 pm Saturday through 12/12/24 to facilitate crane operation.
Single-lane in both directions will be closed Monday to Friday from 11 pm to 5 am next morning through December 27, 2024, to facilitate replacing the East Leaf of West Seating Switch and brakes. Also, double-lane Manhattan-bound will be closed Sunday from 6 am to 2 pm through November 17, 2024, to facilitate replacing warning lights.
Single and double-lane will be closed on North Conduit Avenue between 114 Place and Cross Bay Boulevard and South Conduit Avenue between Gemini Fields near 79 Street and continuing on Nassau Expressway to Cross Bay Boulevard. These closures will be Monday to Friday from 9 pm to 6 am next morning and Saturday to Sunday from 9 pm to 7 am next morning through November 29, 2024 to facilitate lead paint removal and protective coating operations.
Off-ramp will be closed Monday to Thursday from 10 pm to 5 am next morning through November 1, 2024, to facilitate concrete placement.
Eastbound parking lane will be fenced off as a staging area for underdeck rehabilitation work on the Belt Parkway Bridge. Closure will continue through, approximately end of December 2024. South side sidewalk and eastbound traffic will be maintained at all times.
This street will be closed from 6 am to 2 pm Saturday and Sunday through 11/10/24 for window cleaning and painting from boom truck.
North side traffic lanes will be closed Monday to Friday from 7 am to 6 pm to facilitate milling and paving. Two-way traffic will be provided on the south side lanes.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/10/24 for building inspection from boom truck.
This street will be closed from 9 am to 4 pm Friday through 12/10/24 for use of boom and knuckle boom to work on new building.
This street will be closed from 7 pm to 6 am Monday to Friday through 11/8/24 for installation of a sidewalk shed with boom.
Bridge will be intermittently closed for 15 minutes at a time Wednesday from 10 am to 2 pm through October 30, 2024, to facilitate monthly testing.
Eastbound will be closed and bridge will be fully closed intermittently for 15 minutes at a time Monday to Friday from 10 pm to 5 am next morning through November 22, 2024, to facilitate maintenance and repairs. Buses and Emergency Vehicles will have access.
This street will be fully closed from 6 am to 4 pm Friday and 5 am to 9 pm Saturday and Sunday through 11/12/24 for MTA# C-40838 Rehab of pump room at 1026 Rockwell Place.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 10/27/24 for concrete pour and roof replacement on existing pool.
This street will be closed from 5 am to 7 pm Saturday and Sunday for MTA contract A-46026 repairs at five stations on Flushing line-82nd Street station-pour concrete structural slab.
Shoulder and adjacent lane in both directions will be closed Monday to Friday from 9 am to 3 pm, through November 1, 2024, to facilitate electrical repairs.
Single-lane in both directions will be closed Monday to Friday from 11 pm to 5 am next morning through December 27, 2024, to facilitate replacing the East Leaf of West Seating Switch and brakes.
This street will be closed from 9 am to 6 pm Monday to Friday through 11/14/24 to lift materials to rooftop with boom truck.
This street will be closed from 9 am to 5 pm Monday to Friday, and 8 am to 4 pm Saturday through 11/11/24 to facilitate crane operation.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/1/24 to install sewer service.
Single-lane northbound will be closed Monday to Friday from 7 am to 9 am. Single-lane in both directions will be closed Monday to Friday from 9 am to 1 pm and 10 pm to 7 am next morning. These closures are necessary to facilitate structure repair to trusses under deck and will continue through November 1, 2024.
This street will be closed 6 am to 4 pm Friday, and 5 am to 9 pm Saturday Sunday through 10/27/24 for mainline track repairs.
The times listed for closures for street fairs are for the actual times of the street fairs themselves. The streets may be closed for longer to allow for set-up and breakdown. Street fair organizers are generally permitted to begin set-up at 8 am and breakdown must be completed by 7 pm.
This street will be closed from 7 am to 6 pm Monday to Friday, may also work Saturday and Sunday through 11/17/24 for knuckle boom and concrete pump operations.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/23/24 for Water Street corridor Streetscape improvement project.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/12/24 for reconstruction of Nassau Street.
This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 11/3/24 for building inspection from boom truck.
Single-lane will be closed Monday to Friday from 10 am to 2 pm, Monday to Thursday from 10 pm to 5 am next morning, Friday from 10 pm to 7 am next morning, Saturday from 10 am to 3 pm and from 10 pm to 3 pm next day. These closures are part of the Safety and Mobility Improvements and will continue through March 31, 2025.
This street will be closed from 6 am to 3 pm Saturday through 11/2/24 for building inspection and small repairs from boom truck.
Park Avenue Tunnel at East 34 Street overpass will be closed through November 14, 2024 to facilitate Park Avenue Tunnel Rehabilitation Project.
Single-lane Manhattan-bound north upper roadway will be closed 24/7. Double-lane Manhattan-bound north upper roadway will be closed Monday to Friday from 9:30 am to 3 pm. Queens-bound south outer roadway will be closed Sunday to Monday from 11 pm to 6 am next morning, Tuesday to Thursday from 2 am to 6 am, and Friday to Saturday from 11 pm to 6 am. Double-lane Queens-bound south upper roadway will be closed Tuesday to Thursday from 8 pm to 5 am next morning. These closures are necessary to facilitate replacement of upper roadway.
Northbound lanes will be closed Monday to Friday from 7 am to 3:30 pm and from 9 pm to 5:30 am next morning, through November 22, 2024, to facilitate structural steel repairs and utility work. Two lanes of traffic in each direction will be maintained on the southbound lanes.